Premium exhibition stand by GoldenExpo — green with gold accents
Exhibition Stand Manufacturer · EU Projects

Your brand deserves a stand
that stops the entire hall.

While others fight chaos on the show floor — your stand is ready on time, engineered to the millimetre and delivered by people who own every detail. We design, manufacture, build and dismantle exhibition stands across Europe.

7 yrs
on EU show floors
200+
stands delivered
12+
countries served
100%
on-time handovers
Scroll
Trusted on Europe's most demanding show floors
BioFachMWC BarcelonaHeimtextilCosmoprofCPHIParis Air ShowMilipolIntercleanFruit LogisticaAnugaLIGNAVitafoodsEmbedded WorldIBASIA ParisEuropean Coating ShowTransport LogisticSBC SummitBioFachMWC BarcelonaHeimtextilCosmoprofCPHIParis Air ShowMilipolIntercleanFruit LogisticaAnugaLIGNAVitafoodsEmbedded WorldIBASIA ParisEuropean Coating ShowTransport LogisticSBC Summit
What exhibitors actually fear

A trade fair is no place for
"let's see how it goes".

Your brand shows up at a fair to make money. Every hour of chaos, every loose detail, every subcontractor who stops picking up — that's a direct loss. We eliminate those risks before they ever appear.

The stand won't be ready for the opening

We work the night windows others avoid. Time buffer in every schedule. Plan B on transport.

Build quality won't match the render

QA inside our production hall plus a technical handover on-site. Photo documentation at every stage.

No contact with the crew on the floor

A dedicated project manager. One phone number from brief to dismantle.

Subcontractors disappear mid-event

Our own in-house build crew. The same faces year after year. On-site support throughout the show.

Unfinished details at opening

Full lighting, AV and graphics tests the day before. No improvisation.

A stand that damages the brand

Premium materials, finishes and lighting. Built so a visitor stops and says "wow".

The heart of the project

Production is the heart
of every project.

Most companies broker the job. We manufacture it. That's why we know exactly what's happening to your stand from the first board to the last screw on the floor.

Ministry of Interior — Government pavilion — Doha
Doha
Ministry of Interior — Government pavilion
Quantum Ayurveda × Green Space Herbs — Barcelona
Barcelona
Quantum Ayurveda × Green Space Herbs
BioFach — stoisko 180 m² — Norymberga
Norymberga
BioFach — stoisko 180 m²
01

In-house carpentry

We started in production. A stand isn't a "job" to us — it carries our signature.

02

Custom, not catalogue

Every stand is designed for a specific brand, hall and business goal.

05

Safe transport

Packaging engineered around the build, our own logistics, full documentation at every step.

06

Consistent quality

A steady crew. The same hands building your stand this year and five years from now.

Build & dismantle

A crew that knows what it's doing — before you set foot in the hall.

We work the build windows others avoid. Tight schedules, last-minute design changes — your stress ends where our responsibility begins.

MWC
Build

Stand ready before the hall opens.

  • Full lighting, AV and graphics tests
  • Project manager support 24/7 during the show
Anuga
Dismantle

Dismantle without stress, without overruns.

  • Strict compliance with the hall's schedule, to the minute
  • Photo documentation of the post-dismantle state
Selected projects

Stands that earned
a second look.

A slice of work from 2024–2026. Berlin, Paris, Nuremberg, Barcelona, Milan, Amsterdam, Hannover, Hamburg, Lisbon.

How we work

Six stages where
nothing slips.

  1. 01

    Discovery

    Brief, business goals, hall plan, organiser constraints. We map exactly what needs to happen.

  2. 02

    Production

    Carpentry, graphics, lighting, AV. Trial build in our own hall before anything leaves the truck.

  3. 03

    Transport

    Packaging engineered around the build, our own logistics, insurance. Documentation at every step.

  4. 04

    Build

    On-site within the organiser's window. Full systems test. Stand ready before opening.

  5. 05

    On-site support

    Project manager on the floor. Adjustments, fixes and small changes throughout the event.

  6. 06

    Dismantle

    Fast, strictly within the hall's regulations. Materials return to the warehouse, ready for the next edition.

Client protocols

Signed off,
on the show floor.

Official completion protocols signed by our clients after the build — straight from the hall, not from a marketing brochure.

Completion protocol — Paris Airshow · Paris
Verified
Paris Airshow · Paris · 16–22 June 2025
Lohia Aerospace · Hall 4, Booth G-34
"Very good and precise execution. The team was extremely flexible and helpful — there was never a moment of "it can’t be done". A solution was found for every problem."
Completion protocol — Vitafoods · Barcelona
Verified
Vitafoods · Barcelona · 5–7 May 2026
Green Space · Hall 5.0, Booth 5B42
"Very well done. Superb!"
Completion protocol — Paris Airshow · Paris
Verified
Paris Airshow · Paris · 16–22 June 2025
Client stand · Trade show
"All stand construction work has been completed to a very high standard, with great flexibility and problem-solving skills shown. An excellent result."
About the founder

We started on the workshop floor — that's why we know the process from the inside.

Jakub Lewandowski
Founder · GoldenExpo Exhibition Stand Builder
Jakub Lewandowski, founder of GoldenExpo
FAQ

The questions
we hear most often.

How much does an exhibition stand cost?+

Costs depend on size, materials, multimedia and the location of the fair. Custom premium stands typically start around €280–€420 per m² for production alone and scale with complexity. Our quotes always break down design, production, transport, build, dismantle and on-site support — so you know exactly what you're paying for.

Which countries do you deliver in?+

We regularly deliver in Germany, France, Italy, Spain, the Netherlands, the UK, Portugal and Poland. Projects include BioFach, MWC Barcelona, Heimtextil, Cosmoprof, CPHI, Paris Air Show, Milipol, Interclean, Fruit Logistica, Anuga, LIGNA, Vitafoods, Embedded World, IBA.

How far in advance should I get in touch?+

Ideally 4–6 months before the show. Express projects (8–12 weeks) are possible, but they limit material choice and transport windows. The earlier we talk, the more we can polish without compromise.

Do you produce in-house or use subcontractors?+

Production, build and dismantle are handled by our own team. We've worked with the same people for years — that's how we control the quality we promise.

What if the organiser changes the build window at the last moment?+

It happens. We keep buffers in the production schedule, a plan B for transport and a crew ready for night shifts. In practice you usually never even hear about it — we handle it quietly.

Can the stand be reused for the next edition?+

Yes — most structures are designed modularly with future events in mind. After dismantle, elements return to the warehouse, ready to be reconfigured for the next hall and format.

Let's talk

Talk to us before pre-show stress
starts costing you time and money.

Reply
within 4 hours on business days
Quote
complete within 24 hours